Ataşehir · İstanbul · Est. 2016

A move does not fit in one weekend

We fit out and relocate enterprise suites in Ataşehir and plan every job on the floor plan — strip-out, screed, network and furniture, laid out week by week so no team ever blocks another.

  • Phased by the week
  • 1.2 m module grid
  • Handover sign-off sheet
  • Answered by e-mail

up to 2,000 m² · one phased plan module 1.20 m Surveys open

Empty enterprise office floor in Ataşehir with raised-access floor boxes, fresh screed and daylight before fit-out Axis 0.0 — grid 1.2 m
Why weeks, not a weekend

Nobody relocates a floor in two days.
Cabling cures, furniture queues, and a floor plan has an order to it.

2–6 weeks · one honest floor

The honest floor

We would rather tell you that up front. A realistic suite move runs two to six weeks because the network and the furniture physically cannot land on the same day — one is tested and labelled before the other arrives. Everything below is built around that order.

The order of works · W1 → W6

Every suite follows the same floor-plan sequence

Six phases, read off the plan and the 1.2 m module grid. Each one is signed off before the next team sets foot on the floor — that is how a 1,400 m² suite moves without a single day of double-handling.

W1Strip-out
Protected strip-out of an existing office floor with dust screens and labelled zones
Phase 01 — Strip-out & protection

Clear the floor, protect the shell

Old partitions, cabling and carpet come out under dust protection. Lift lobbies and cores are sheeted; the slab and raised-access floor are surveyed against the plan so we know exactly what we inherit.

module 1.20 m3–5 days · 900 m²

W2Screed
Fresh floor screed and new partition studwork during office fit-out
Phase 02 — Screed, plaster & partitions

The floor has to cure before anything stands on it

New screed, levelling and plaster go in, then partitions and meeting-room shells. This is the phase people most want to skip — and the one physics will not let you. Curing time is fixed, not negotiable.

module 1.20 mmin. 1 week · per level

W3Network
Structured network cabling run in containment trays above an office ceiling grid
Phase 03 — Network & power

Cabling is pulled, tested and labelled — then left alone

Arda's team runs structured cabling and power to every position on the plan, certifies each link, and labels the patch schedule. Nothing sits on those runs until they pass — which is precisely why furniture cannot arrive the same week.

module 1.20 m~90 seats · per week

W4Floor boxes
Close-up of a numbered floor access box with data and power outlets set into the raised floor
Phase 04 — Floor boxes & finishes

Outlets set into the raised floor, on the module

Floor access boxes are cut on the 1.2 m grid, numbered and tied back to the patch schedule. Flooring, paint and joinery finish around them. At this point the plan on paper and the plan underfoot finally match.

module 1.20 m1 box · every 36 m²

W5Furniture
Desks and task chairs being installed across a finished office floor
Phase 05 — Furniture install

Desks land on a floor that is already live

Gül coordinates delivery slots so trucks, lifts and installers never collide. Each desk is placed against its floor box, powered, and checked off the seating plan. This is a different week from cabling — by design, not by accident.

module 1.20 m~80 seats · per week

W6Handover
Finished enterprise office suite ready for handover with daylight and clear desks
Phase 06 — Snag & handover

A walk-through and a signed sheet, not a handshake

We snag every room, close defects, and walk the floor with your facilities team against a written checklist. You receive as-built drawings, the patch schedule and the keys. The floor is move-in ready — and documented.

module 1.20 m1 sheet · signed

Why it is never one weekend

Network and furniture arrive on different days

These are the two tracks people assume can happen at once. They cannot. Here is exactly why, and how we keep the gap between them as short as it can honestly be.

Track A — first

Network & power

Cabling defines where everything else can go, so it leads.

  • Runs pulled to every position on the plan
  • Each link tested and certified individually
  • Patch schedule labelled and documented
  • Floor boxes capped and numbered to the grid

every link certified

Must be signed off before any desk is placed.
Track B — after

Furniture

Heavy, scheduled by truck and lift, and placed onto live outlets.

  • Delivery windows booked against building access
  • Desks set against their numbered floor box
  • Power and data checked at every seat
  • Seating plan signed off desk by desk
1–2 weeks after cabling Typically one to two weeks after cabling, never the same day.
Move planner & handover checklist

Enter your floor and seats — read back the week strip

Set the area and the number of seats. The planner lays out the phased week strip and a handover checklist scaled to your suite. It is an estimate to think with, not a quote — every real plan is drawn against your actual floor.

Estimate only

Your floor

Minimum 80 m² · cap 2,000 m² per single plan

module 1.20 m

The strip assumes one zone. Larger footprints are delivered zone by zone so teams never overlap.

Request this as a drawn plan →

Phased week strip

—

Handover checklist

    What handover actually means

    A floor you can occupy on Monday, on paper and underfoot

    The record you keep

    Handover is a document, not a feeling. Before we hand you keys, your facilities team walks the floor with us against a written sheet and signs each line. Then you keep the record.

    • As-built floor plan, PDF and DWGmatched to the 1.2 m module grid
    • Patch schedule & network test certificatesevery link labelled and logged
    • Floor-box registernumbered, capped, mapped to seats
    • Snag list closed and counter-signedphoto record of each defect
    • Cleaning, waste clearance & keysmove-in ready

    5 lines · counter-signed

    Clean, finished office suite at handover with numbered floor boxes visible
    The plan · three ways a suite moves

    Every suite is scoped on the plan, never off a shelf

    There is no price list, no online booking and no account here. We walk your floor, draw the week strip and reply by e-mail. Below is the plan in rooms — the three ways a floor moves, and what you keep at the end.

    Most suitesK-1

    Fit-out & move

    The full W1 → W6 strip: strip-out, screed, network, floor boxes, furniture and a signed handover. Network and furniture always land on separate weeks.

    up to 2,000 m² · one zone

    Scoped by survey
    K-2

    Move only

    An existing fitted floor, relocated and re-commissioned — sequenced delivery, desks to the seating plan, re-patch and test at every seat.

    existing fitted floor

    Scoped by survey
    K-3

    Zoned programme

    Footprints beyond 2,000 m² or several levels, delivered zone by zone with a coordinator per floor so one team never blocks another.

    2,000 m²+ · multi-floor

    Zoned
    At handoverK-4

    What we hand back

    As-built drawings in PDF and DWG, the full patch schedule and test certificates, a numbered floor-box register, a closed snag list and the keys.

    one signed sheet

    A sample floor, read as a ledger

    Every plan is drawn to your actual floor. This is one worked example on the 1.2 m module — area, seats and the kit that lands on it — so you can see how the drawing and the real floor line up before a single wall comes down.

    24.60 m · typical corridor run

    The people on your floor

    Three leads, one floor plan

    You deal with the same three people from survey to handover. No rotating subcontractor faces — the leads who draw the plan are the leads who walk it with you at the end.

    Tolga Erdoğan, fit-out lead and founder of Katplan

    Tolga Erdoğan

    Fit-out lead · Founder

    K-lead-1

    Site engineer by training, 17 years on Istanbul commercial floors. Owns the W1 → W4 sequence and the as-built drawings.

    Gül Şahin, move coordinator at Katplan

    Gül Şahin

    Move coordinator

    K-lead-2

    Runs delivery windows, lift bookings and the seating plan. If two trucks would clash, Gül is the reason they do not.

    Arda Yılmaz, network lead at Katplan

    Arda Yılmaz

    Network lead

    K-lead-3

    Structured cabling and certification. Every link that leaves our floor is tested, labelled and logged against the plan.

    Read the full story →

    Floors we have moved

    Completed floors, read as records

    K-AOccupied

    Fintech suite · Ataşehir

    Two floors handed over in five weeks. Network and furniture weeks kept apart from day one; a single lift re-booking was flagged and fixed the same day.

    1,620 m² · 2 floors · 5 weeks

    K-BOccupied

    Logistics HQ · Kozyatağı

    Every floor box numbered, every link logged. When a desk later lost data, the port was found in the patch schedule in under a minute.

    1,180 m² · 1 floor · 4 weeks

    K-COccupied

    Consulting firm · Ümraniye

    A weekend move was asked for and talked through to a three-week strip instead. Furniture ran two days behind — flagged in advance, no surprise.

    620 m² · 1 floor · 3 weeks

    Floor notes

    Recently on site

    The log we keep for ourselves, published the way it is written: what was handed over, which floors are open this week, and what we changed in the method after it bit us.

    1. K-117Barbaros Mah.

      Handover: 980 m², one floor, 118 seats

      Handed over

      Strip-out to handover in four weeks. Cabling was certified in week three, furniture came up over the two days after it, and the keys went back on a Friday morning with the patch schedule printed and left in the comms room.

      980 m² · 4 weeks · 27 floor boxes

    2. K-121Kozyatağı

      Zone two of a 2,400 m² programme opened

      On site

      Two floors cut into four zones so one trade never blocks another. Zone one is on furniture week while zone two is still curing screed; the service lift is shared by the hour on a written slot list signed off by building management.

      2,400 m² · 2 floors · 4 zones

    3. K-00method

      Floor-box mapping moved into the handover pack

      Method change

      Every box is now photographed open, numbered and tied to a grid coordinate before the raised floor is closed. When a desk loses its link a year later, the port is found in the patch schedule in under a minute instead of lifting six panels to look for it.

      1 box per 36 m² · photographed · numbered

    4. K-114Ümraniye

      Consulting suite handed over, 620 m² in three weeks

      Handed over

      A weekend move was asked for and talked through into a three-week strip instead. Furniture ran two days behind the plan — flagged at the Monday walk rather than on the day it mattered, so the handover date itself never moved.

      620 m² · 3 weeks · 74 seats

    5. K-00diary

      Survey diary opened for December and Q1 2027

      Availability

      Suite surveys are being written into the diary from early December, and two zoned programmes are already scheduled for the first quarter. Scope is still answered by e-mail after we have walked the floor: there is no price list and no online booking here.

      2 zoned programmes · Q1 2027

    6. K-00schedule

      Lift windows are booked at survey, not at delivery

      Method change

      One slipped week in August came down to a service lift a building had already promised to another tenant. The lift window now goes into the week strip on the day we walk the floor, and the building signs it off before a single truck is ordered.

      1 slipped week · 0 since

    site log · updated after every walk

    Before you ask

    Questions we get on every survey

    Can you really not do it in one weekend?

    No — and we would rather say so. New screed has to cure, and network cabling must be pulled, tested and labelled before any desk sits on it. Those two things cannot share a day. The honest floor for a small suite is about two weeks; a full fit-out is four to six.

    Why do network and furniture land in different weeks?

    Cabling defines where every desk can go, so it leads and is certified first. Furniture is heavy, booked by truck and lift, and placed onto live, tested outlets. If furniture arrives before cabling passes, it just gets moved twice. We keep the gap as short as the testing allows — usually one to two weeks.

    What is the 1.2 m module grid?

    It is the grid your raised-access floor and ceiling are built on. We plan floor boxes, partitions and desks against it so the drawing and the real floor match. Roughly one floor box serves every 36 m², numbered and tied back to the patch schedule.

    How big a floor can you handle?

    A single phased week strip caps at about 2,000 m². Beyond that — or across several levels — we split the job into zones, each with its own strip and coordinator, so one team never blocks another. The planner on this page will flag when your footprint needs zoning.

    Do you take bookings or payment online?

    No. There is no price list, no online booking and no account here. Fit-out and moves are scoped per floor after a survey. You tell us the area and seats, we draw the plan and reply by e-mail. The planner above is only an estimate to think with.

    What happens if the schedule slips?

    We flag it before it bites. Most slips are access-related — a lift reservation, a building permit, a delivery window. Your coordinator reschedules around it and updates the week strip the same day. Weather and force-majeure delays move the strip without penalty; see our terms.

    Request the floor plan

    Tell us the floor. We will draw the week strip.

    Send the area and seat count and we will come back within one working day to book a survey. No account, no payment — just a scope and a plan.

    Direct lines

    Phone

    +90 216 580 44 21Mon–Fri 09:00–18:00

    WhatsApp

    +90 532 418 76 09Fastest for a quick question

    Email

    hello@fitoutandmove.liveReply within one working day

    Instagram

    @katplan.istFloors we are on now

    Studio

    Barbaros Mah., Ataşehir Bulvarı No:14/5Ataşehir / İstanbul 34758

    Directions

    Open in Maps →Visitor parking on request

    One form, one working day

    Tell us the floor area, the seat count and your target move-in date on the contact page. One of the three leads replies within one working day to book a survey and start drawing your week strip — no account, no payment, no obligation.

    • A written scope after we have walked your floorno price list, answered by e-mail
    • A phased week strip drawn to your suitenetwork and furniture on separate weeks
    • The same three leads from survey to handoverno rotating subcontractor faces

    1 working day · reply

    Contact us →